Taipei Performing Arts Center design by OMA

Taipei Performing Arts Center design by OMA
header_logo%2520copy%2520copy.jpg (805×90) Taipei Performing Arts Centre by OMA from ArtefactoryLab on Vimeo. Project: Taipei Performing Arts Center Status: Competition: 2008-2009. Construction begins: 2012. Scheduled completion: 2015 Client: Department of Cultural Affairs, Taipei City Government Budget: Estimated: 5.4 billion Taiwan Dollars (around €140 million) Program: Total 50,000m2. One 1,500-seat theatre and two 800-seat theatres Height: 63m Partners-in-charge: Rem Koolhaas, David Gianotten Associate-in-charge: Adam Frampton Design team: Ibrahim Elhayawan with: Yannis Chan, Hin-Yeung Cheung, Jim Dodson, Inge Goudsmit, Alasdair Graham, Vincent Kersten, Chiaju Lin, Vivien Liu, Kai Sun Luk, Kevin Mak, Slobodan Radoman, Roberto Requejo, Saul Smeding, Elaine Tsui, Viviano Villarreal, Casey Wang, Leonie Wenz Competition team: partners / designers: Rem Koolhaas, David Gianotten, Ole Scheeren, and senior architects: André Schmidt, Mariano Sagasta and Adam Frampton, with: Erik Amir, Josh Beck, Jean- Baptiste Bruderer, David Brown, Andrew Bryant, Steven Chen, Dan Cheong, Ryan Choe, Antoine Decourt, Mitesh Dixit, Pingchuan Fu, Alexander Giarlis, Richard Hollington, Shabnam Hosseini, Sean Hoo, Takuya Hosokai, Miguel Huelga, Nicola Knop, Chiaju Lin, Sandra Mayritsch, Vincent McIlduff, Alexander Menke, Ippolito Pestellini, Gabriele Pitacco, Shiyun Qian, Joseph Tang, Agustin Perez-Torres, Xinyuan Wang, Ali Yildirim, Patrizia Zobernig COLLABORATORS Local architect: Artech Architects Theatre consultant: dUCKS scéno, CSI Interior designer: Inside Outside Landscape designer: Inside Outside Acoustic consultant: DHV Structural engineer: Arup Structure, Evergreen MEP engineer: Arup MEP, Heng Kai, IS Lin Fire engineer: Arup Fire, TFSC Lighting consultant: Chroma 33 Facade engineer: ABT, CDC Sustainability consultant: Arup Building Physics, Segreene Geotechnical engineer: Sino Geotech Traffic consultant: EECI Traffic Model: Vincent de Rijk, RJ Models Photography: Frans Parthesius, Iwan Baan Animation: Artefactory Nearly two years after OMA was announced winner of a two-stage international competition, the construction of the new Taipei Performing Arts Center has commenced. This ambitious project, led by OMA partners Rem Koolhaas and David Gianotten, generated a lot of debate among architects when it was announced back in 2009 due to its particular form. Morphed by a series of programatic operations, the form intersects three types of theater in order to accommodate a variety of performances. The main theater, which seats 1,500, is expressed on the exterior as a large sphere while the two smaller theaters, each capable of seating 800, are represented as peripheric cubes. All the stage accommodations are brought together within the central cube, allowing for more flexibility as theaters can be used independently or combined, thus expanding the possibilities for experimental performances – an art which is very strong inTaiwan. At the same time, and in a similar way as OMA’s CCTV building in Beijing, China, a “public loop” channels circulation through the building, exposing the spaces that make the TPAC work, areas typically hidden from the public but are as revealing as the performances themselves. In this aspect, the building is like a machine at work with its engine exposed, somehow reminding me of OMA’s Prada Transformer – a machine-like building (the anti-blob) that changed its configuration to host different types of events. The 180 million dollar project is set to be completed in 2015. More details, including sections and updated renders, after the break: Why have the most exciting theatrical events of the past 100 years taken place outside the spaces formally designed for them? Can architecture transcend its own dirty secret, the inevitability of imposing limits on what is possible? In recent years, the world has seen a proliferation of performance centres that, according to a mysterious consensus, consist of more or less an identical combination: a 2,000-seat auditorium, a 1,500-seat theatre, and a black box. Overtly iconic external forms disguise conservative internal workings based on 19th century practice (and symbolism: balconies as evidence of social stratification). Although the essential elements of theatre– stage, proscenium, and auditorium– are more than 3,000 years old, there is no excuse for contemporary stagnation. TPAC takes the opposite approach: experimentation in the internal workings of the theatre, producing (without being conceived as such) the external presence of an icon. TPAC consists of three theatres, each of which can function autonomously. The theatres plug into a central cube, which consolidates the stages, backstages and support spaces into a single and efficient whole. This arrangement allows the stages to be modified or merged for unsuspected scenarios and uses. The design offers the advantages of specificity with the freedoms of the undefined. Performance centres typically have a front and a back side. Through its compactness, TPAC has many different “faces,” defined by the individual auditoria that protrude outward and float above this dense and vibrant part of the city. The auditoria read like mysterious, dark elements against the illuminated, animated cube that is clad in corrugated glass. The cube is lifted from the ground and the street extends into the building, gradually separating into different theatres. The Proscenium Playhouse resembles a suspended planet docking with the cube. The audience circulates between an inner and outer shell to access the auditorium. Inside the auditorium, the intersection of the inner shell and the cube forms a unique proscenium that creates any frame imaginable. The Grand Theatre is a contemporary evolution of the large theatre spaces of the 20th century. Resisting the standard shoebox, its shape is slightly asymmetrical. The stage level, parterre, and balcony are unified into a folded plane. Opposite the Grand Theatre on the same level, the Multiform Theatre is a flexible space to accommodate the most experimental performances. The Super Theatre is a massive, factory-like environment formed by coupling the Grand Theatre and Multiform Theatre. It can accommodate the previously impossible ambitions of productions like B.A. Zimmermann’s opera Die Soldaten (1958), which demands a 100-metre-long stage. Existing conventional works can be re-imagined on a monumental scale, and new, as yet unimagined forms of theatre will flourish in the Super Theatre.
The general public—even those without a theatre ticket—are also encouraged to enter TPAC. The Public Loop is trajectory through the theatre infrastructure and spaces of production, typically hidden, but equally impressive and choreographed as the “visible” performance. The Public Loop not only enables the audience to experience theatre production more fully, but also allows the theatre to engage a broader public.
References: OMA; www.archdaily.com
milimetdesign – Where the convergence of unique creatives
header_logo%2520copy%2520copy.jpg (805×90)
TYPE OF WORKS
milimetdesign banner
Most Viewed Posts
milimet banner
DATAA